120 minutes: Correct the notice or recover only the names
Opening agreement: 10 minutes
Compare the schedule and resource priorities: 30 minutes
Work below the rim on the chosen objects: 40 minutes
Bring the trolley up and choose what remains: 30 minutes
Closure and debrief: 10 minutes
Verification costs a work turn. The bench-and-memorial plan deliberately avoids the valve and spends both straps; it cannot claim a complete garden record.
Starting information: A dry-window work order
Starting state: Dry access turns = 7; Dry rigging straps = 2; Maintenance sequence verified = false; Correct valve window held = false; Trolley positioned = false; Memorial secured = false; Garden plan copied = false; Tablet raised to rim = false; Low beds closed = false; Visitor bench secured = false

Dry access turns: __________ (clock)
Dry rigging straps: __________ (resource)
Maintenance sequence verified: __________ (knowledge)
Correct valve window held: __________ (flag)
Trolley positioned: __________ (flag)
Memorial secured: __________ (flag)
Garden plan copied: __________ (flag)
Tablet raised to rim: __________ (flag)
Low beds closed: __________ (flag)
Visitor bench secured: __________ (flag)